Request a quote
Kattsafe

Introducing: Kattsafe industrial modular access

We’ve been manufacturing innovative modular access systems you can count on for over 10 years.
And now, we’re taking things to new heights with the introduction of our stair tower system, the first of our new industrial modular access range.


Made from high-strength aluminium and with more scalability in less footprint, this stair tower can go where others simply can’t.

Sandringham line, South Yarra VIC

Construction on the level crossing removal works and other rail upgrades has been occurring throughout the Melbourne metro rail system since 2016. It is estimated, at completion, to have cost approx $6 billion.

The situation

Construction on the level crossing removal works and other rail upgrades has been occurring throughout the Melbourne metro rail system since 2016. It is estimated, at completion, to have cost approx $6 billion.

In close proximity to the South Yarra Station heavy electrical boxes required a system enabling easy access. The system needed to be designed to support extreme weight and wind loads. A platform that could be hand installed was preferred to avoid any welding or hot works.

Project

Sandringham Line - South Yarra Sidings, South Yarra VIC

Industry

Transport

Solution

Kattsafe worked closely with John Holland to design and engineer a large platform. Our technical team attended on-site to assist with support and provided detailed shop drawings.

Specialised engineering was undertaken ensuring the modular access system had the required capacity to handle the wind and weight loads of the equipment.

Providing the client with a detailed installation manual which gives step by step guidance, John Holland personnel carried out the install with the Kattsafe team on standby should they encounter any problems with the project.

Loading...