Request a quote
Kattsafe
","id":"json-ld-254e5031-6319-47ed-a208-839e99e8abb1"}])

Introducing: Kattsafe industrial modular access

We’ve been manufacturing innovative modular access systems you can count on for over 10 years.
And now, we’re taking things to new heights with the introduction of our stair tower system, the first of our new industrial modular access range.


Made from high-strength aluminium and with more scalability in less footprint, this stair tower can go where others simply can’t.

Why height safety planning is a critically important commercial decision

Height safety decisions shape long-term liability, cost, and asset risk, whether they are treated that way or not. This article explains why early planning is a commercial decision, not a late-stage compliance task.

At a glance

The $5B blind spot
Fall-related injuries cost the Australian economy $5 billion annually, which is a risk that lives on your balance sheet.

Locked-in liability
Late-stage safety additions create permanent "design debt" and higher maintenance costs.

Strategic integration
Moving height safety from a "compliance checkbox" to a design priority protects your budget and your people.

The commercial reality

Height safety is often treated as a technical footnote, but for building owners and asset managers, it is a long-term financial commitment. Whether you're managing a high-stakes data centre or a commercial high-rise, your height safety decisions influence liability, operational continuity, and asset value for decades.

Height safety is a financial decision, whether it is treated that way or not

Height safety decisions affect far more than compliance; they influence cost, liability, and long-term asset performance.

In critical infrastructure environments like data centres, the cost of disruption, liability, and access failure is amplified.

Every commercial and industrial building contains areas where people must work at height. This is particularly true across industries with complex height safety requirements, where access is ongoing rather than occasional. Roofs, facades, plant zones, skylights, and service corridors all require ongoing access.

When a fall occurs, the consequences extend far beyond the incident itself. In Australia, fall-related injuries cost the health system around $5 billion annually, before accounting for lost productivity, insurance escalation, litigation, or asset downtime.

For building owners and asset managers, height safety is not a technical footnote. It is a long-term risk decision that affects liability, operational continuity, and asset value.

Why late-stage decisions create permanent exposure

This is especially common in high-rise buildings with ongoing access obligations, where early design decisions directly affect long-term compliance and maintenance.

Height safety is still frequently treated as something to “add later”. In our experience, when systems are specified after structural and services decisions are locked in, projects inherit problems that cannot be designed out.

This typically results in:

  • Compromised system placement

  • Higher modification and installation cost

  • Documentation gaps that delay handover

  • Ongoing difficulty with inspection and maintenance

Confident planning requires early awareness of Australian Standards such as AS/NZS 1891 and AS 1657. When these are addressed late, compliance becomes reactive rather than designed.

The hidden cost of "design debt"

When height safety is treated as a late-stage "add-on," projects inherit what we call "design debt". When systems are forced into a locked-in structural plan, you aren't just paying for hardware, you're paying for:

  • Structural retrofitting
    The potential for higher installation costs to "make it work" around existing HVAC or plant equipment.

  • Operational friction
    Systems that are compliant but difficult to use, leading to slower maintenance cycles and increased contractor risk.

  • Certification delays
    Possible documentation gaps that can stall handovers and occupancy permits.

The takeaway

Investing in getting a fit for purpose solution can save thousands in the long run, not just in preventing injury, and associated liability costs, but for improving longevity and performance.

Purpose-first planning changes outcomes

Purpose-first planning allows engineered and manufactured solutions to be aligned with real tasks rather than forced into place later.

Many poor outcomes begin with the wrong starting point.

“I need a ladder.” “I need a handrail.”

A more considered question is “I need access for this task, at this frequency, in this environment.”

This purpose-first mindset leads to systems that reflect real use, not assumptions. It reduces compromise, improves durability, and lowers whole-of-life exposure.

How to use this resource

This article establishes the commercial case for early-stage safety integration. We’ve focused on the economic and liability risks of ignoring height safety during the design phase.

Because height safety is highly technical, we have separated the strategic "why" from the technical "how". The strategy (this article) addresses the $5B risk and why "adding it later" is a commercial red flag. The helpful guides referenced below provide more insight into the how, with specific system selection, compliance walkthroughs, and specification support. See our Ultimate Planning Guide and Specification Checklist.

Download the planning resources before you commit